Logi sisse et näha seda üksust teistes keeltes
The construction of the first segment of the Yorkshire section of the M62 motorway, situated between the county boundary of Saddleworth Moor and Outlane - Scammonden dam/embankment in the snow.
The construction of the section between Saddleworth and Pole Moor was a complicated task, given the inhospitable conditions of its hilly terrain, numerous peat bogs, and undesirable weather. To build this section of the motorway, large amounts of material had to be excavated, consisting of solid rock and peat, which had to be cut from the rock strata and was eventually deposited on hillsides adjac…
Kaasautorid
- Kirklees
Kirjastus
- Kirklees
Teema
- Kirklees1
Üksuse liik
- Image
Kaasautorid
- Kirklees
Kirjastus
- Kirklees
Teema
- Kirklees1
Üksuse liik
- Image
Pakkuja institutsioon
Agregaator
Selles üksuses sisalduva meedia õiguste avaldus (kui pole teisiti märgitud)
- http://rightsstatements.org/vocab/InC/1.0/
Identifikaator
- http://www.kirkleesimages.org.uk/frontend.php?keywords=Ref_No_increment;EQUALS;km04130&pos=2&action=zoom
Formaat
- JPEG/IMAGE
Keel
- EN-GB
On osa
- Kirklees Image Archive
Pakkuja riik
- United Kingdom