Logáil isteach chun an mhír seo a fheiceáil i dteangacha eile
The construction of the first segment of the Yorkshire section of the M62 motorway, situated between the county boundary of Saddleworth Moor and Outlane - Scammonden dam/embankment in the snow.
The construction of the section between Saddleworth and Pole Moor was a complicated task, given the inhospitable conditions of its hilly terrain, numerous peat bogs, and undesirable weather. To build this section of the motorway, large amounts of material had to be excavated, consisting of solid rock and peat, which had to be cut from the rock strata and was eventually deposited on hillsides adjac…
Rannchuiditheoirí
- Kirklees
Foilsitheoir
- Kirklees
Ábhar
- Kirklees1
Cineál míre
- Image
Rannchuiditheoirí
- Kirklees
Foilsitheoir
- Kirklees
Ábhar
- Kirklees1
Cineál míre
- Image
Institiúidí soláthartha
Comhbhailitheoir
Ráiteas um Chearta Ceadúnas do na meáin sa mhír seo (mura sonraítear a mhalairt)
- http://rightsstatements.org/vocab/InC/1.0/
Aitheantóir
- http://www.kirkleesimages.org.uk/frontend.php?keywords=Ref_No_increment;EQUALS;km04130&pos=2&action=zoom
Formáid
- JPEG/IMAGE
Teanga
- EN-GB
Is cuid de
- Kirklees Image Archive
Tír sholáthair
- United Kingdom