Kirjaudu sisään nähdäksesi tämän aineisto muilla kielillä
The construction of the first segment of the Yorkshire section of the M62 motorway, situated between the county boundary of Saddleworth Moor and Outlane - Scammonden dam/embankment in the snow.
The construction of the section between Saddleworth and Pole Moor was a complicated task, given the inhospitable conditions of its hilly terrain, numerous peat bogs, and undesirable weather. To build this section of the motorway, large amounts of material had to be excavated, consisting of solid rock and peat, which had to be cut from the rock strata and was eventually deposited on hillsides adjac…
Myötävaikuttajat
- Kirklees
Julkaisija
- Kirklees
Aihe
- Kirklees1
Aineisto tyyppi
- Image
Myötävaikuttajat
- Kirklees
Julkaisija
- Kirklees
Aihe
- Kirklees1
Aineisto tyyppi
- Image
Aineiston tarjoaja
Aggregaattori
Tämän aineisto median lisenssi (ellei toisin mainita)
- http://rightsstatements.org/vocab/InC/1.0/
Tunniste
- http://www.kirkleesimages.org.uk/frontend.php?keywords=Ref_No_increment;EQUALS;km04130&pos=2&action=zoom
Muoto
- JPEG/IMAGE
Kieli
- EN-GB
On osa kohdetta
- Kirklees Image Archive
Alkuperämaa
- United Kingdom